Welcome to nanjing debon metal equipment engineering co., ltd official website!
搜索
Search

CN | EN

走进德邦

Group Information

Check category
/
/
/
The refined tower of Guangxi Huayi Acetic Acid Project undertaken by Nanjing Debang has been successfully delivered

The refined tower of Guangxi Huayi Acetic Acid Project undertaken by Nanjing Debang has been successfully delivered

  • Categories:Group news
  • Author:
  • Origin:
  • Time of issue:2020-04-21 15:10
  • Views:

(Summary description)The refining tower, the core equipment of the large, high, and precision equipment in the annual production of 500000 tons/year acetic acid project of Guangxi Huayi Energy and Chemical Co., Ltd., undertaken by Nanjing Debang Metal Equipment Engineering Co., Ltd., was successfully delivered on December 28, 2019. The main material of the tower is S31603, with 81 layers of trays, a total height of 68 meters, and a total weight of 204 tons. The equipment manufacturing process requires high precision, difficult manufacturing, and tight delivery time.

The refined tower of Guangxi Huayi Acetic Acid Project undertaken by Nanjing Debang has been successfully delivered

(Summary description)The refining tower, the core equipment of the large, high, and precision equipment in the annual production of 500000 tons/year acetic acid project of Guangxi Huayi Energy and Chemical Co., Ltd., undertaken by Nanjing Debang Metal Equipment Engineering Co., Ltd., was successfully delivered on December 28, 2019. The main material of the tower is S31603, with 81 layers of trays, a total height of 68 meters, and a total weight of 204 tons. The equipment manufacturing process requires high precision, difficult manufacturing, and tight delivery time.

  • Categories:Group news
  • Author:
  • Origin:
  • Time of issue:2020-04-21 15:10
  • Views:
Information

  The refining tower, the core equipment of the large, high, and precision equipment in the annual production of 500000 tons/year acetic acid project of Guangxi Huayi Energy and Chemical Co., Ltd., undertaken by Nanjing Debang Metal Equipment Engineering Co., Ltd., was successfully delivered on December 28, 2019. The main material of the tower is S31603, with 81 layers of trays, a total height of 68 meters, and a total weight of 204 tons. The equipment manufacturing process requires high precision, difficult manufacturing, and tight delivery time.

  

1

 

  

1

 

  In order to actively respond to the national policy of the the Belt and Road Initiative, Shanghai Huayi Group signed a strategic cooperation agreement with the Guangxi government - Industrial Gas Island Comprehensive Utilization Project, which is located in Qinzhou, the coast of the South China Sea. Since the company undertook this project, it has attached great importance to it, and set up a project team to organize and plan. In the face of short delivery time, great manufacturing difficulty, and high quality requirements, the project team has refined the key process points; The technical department controls the key points and difficulties of the technology; Optimize the process; The inspection department strictly controls quality and follows the outline of the quality management plan to control each control point, especially the precision control of tower components, which has reached the advanced level in China. Debang people use their sweat and wisdom to deliver satisfactory answers to the owners. This once again demonstrates the company's market competitiveness in manufacturing specialty materials and stainless steel products.

  

1

 

  

1

 

  This tower was successfully delivered as the perfect finale for Debon Corporation in 2019. It is also a New Year's greeting and best wishes for Shanghai Huayi Group in 2020, wishing it a new and wonderful journey in the new year.

Subordinate enterprise

■ NANJING SANBANG NEW MATERIAL TECHNOLOGY CO., LTD.
■ Jiangsu Debang Engineering Co., Ltd.